Short answer: Most home roof replacements take one to three days. The crew protects your yard, tears off the old roofing, inspects and repairs the roof deck, installs drip edge, ice and water shield and underlayment, then flashing, shingles and ridge vents, and finishes with cleanup and a magnetic sweep for nails. A permit and final inspection are usually required.
A new roof is a big project, but it usually goes faster than people expect. Knowing the roof replacement process helps you prepare your home and understand what the crew is doing each day.
Before work starts
- Sign a written contract with materials, scope, schedule, permit and warranties
- Confirm the roofer has pulled the permit
- Move cars out of the driveway and garage
- Move patio furniture, grills and planters away from the house
- Take pictures and fragile items off walls, since hammering can shake them
- Cover belongings in the attic, since dust and debris can fall

Step by step on installation day
- Protection: tarps over plants, siding and the yard, and a dumpster placed near the house.
- Tear off: old shingles, underlayment and flashing are removed down to the roof deck.
- Deck inspection: rotted or soft boards are replaced. Ask how extra decking is priced.
- Drip edge: metal edging along the eaves and rakes to guide water into gutters.
- Ice and water shield: a waterproof layer at the eaves, valleys and around penetrations, often required in cold climates.
- Underlayment: covers the rest of the deck.
- Flashing: new metal around chimneys, walls, vents and skylights.
- Shingles: installed from the bottom up, with the nailing pattern the manufacturer requires.
- Ventilation: ridge vents or other vents installed so the attic can breathe.
- Cleanup: debris removed and a magnetic sweep for nails.

After the roof is on
- A final inspection by the city, where required
- A walk around with the roofer to check the work and cleanup
- Written manufacturer and workmanship warranties
- Registration of the manufacturer warranty if needed
- Final payment only after you are satisfied and the inspection passes
What can delay a roof replacement
- Rain, high wind or extreme cold
- More rotted decking than expected
- Material delivery delays
- Permit or inspection scheduling

Read about roof replacement, roofing cost and our guide to choosing a roofing contractor.

Quick answers: roof replacement process
How long does a roof replacement take?
Most home roofs take one to three days, depending on size, weather and repairs to the deck.
Do I need to be home during a roof replacement?
Not always, but be reachable in case the crew finds rotted decking or other surprises.
Is a permit needed to replace a roof?
Usually, yes. Your roofer should pull it and arrange the final inspection.
What happens if the roof deck is rotten?
Damaged boards are replaced, often priced per sheet. Ask about this before signing.
Who replaces roofs?
A licensed roofing contractor. Sifixit can connect you with a local roofer.
Related
This guide covered roof replacement process. For more background, see Ready.gov’s severe weather advice, and if you need help, Sifixit can connect you with a local provider.
This guide is general information for homeowners, not professional, insurance or safety advice for your situation.
More helpful guides
- Is a roof leak an emergency?How to tell if a roof leak needs help tonight or can wait for a normal repair, and...
- Flat roof problems: leaks, ponding water and repair optionsThe most common flat roof problems are ponding water, open seams, blisters, cracked flashing and clogged drains.
- How to choose a roofing contractor and avoid storm chasersChoose a local roofer with a verifiable address, the license or registration your state requires, liability and workers...
- Asphalt shingles vs metal roof: which is better for your homeAsphalt shingles cost less up front, are easy to repair and suit most homes.
- How to find a roof leakStart in the attic with a flashlight during or right after rain, and look for wet wood, water...
- How long does a roof lastIt depends on the material. Asphalt shingle roofs often last around 20 to 30 years, metal roofs often...